Sipel Richard-P1|CWR Daily Status 1 of 3|The team is continuing to review and evaluate test data for the full to partial ops drop anomaly. The interrupt 0 signal (from J6 to breakout box) will be characterized to determine
2001-09-11
19:47:05
Arch
[1001193]
C
ALPHA
Sipel Richard-P1|CWR Daily Status 2 of 3|its threshold of when the box goes into partial ops. Also today, team successfully completed the impedance measurement section of the 1553 test and have finished 20% of the ROTTs.
2001-09-11
19:47:55
Arch
[1001193]
C
ALPHA
Sipel Richard-P1|CWR Daily Status 3 of 3|The third shift team will be conducting the remainder of the 1553 electrical and protocol tests tonight. If successful, then the effort to run this test again during protoqual is not necessary.